The following roads are scheduled to be paved in 2026:
- Lake Ave- Broadway to bridge
- Old Lake- Pardee Ave to Lake Ave
- Franklin St- Lake Ave to Church St
- Lombardy St.- Broadway to Pardee Ave
- Walter Winter Dr.
Milling is scheduled to begin June 1st and paving is scheduled to begin June 11th.
Please note that schedule may vary slightly.
