Paving Schedule 2026

The following roads are scheduled to be paved in 2026: Lake Ave- Broadway to bridge Old Lake- Pardee Ave to Lake Ave Franklin St- Lake Ave to Church St Lombardy St.- Broadway to Pardee Ave Walter Winter Dr. Milling is scheduled to begin June 1st and paving is...